APB Storage

MO

New Drive-Up Facility

The project commenced with a thorough assessment of the rock subgrade conditions. By collaborating closely with engineers and soil consultants, we developed a comprehensive plan to tackle the challenges associated with the rocky terrain.

Key Achievements:

  • Cost-Effective Engineering: Our engineered solution minimized the difficult aspect of rock excavation, resulting in savings of over $400,000 in potential excavation costs.
  • Stormwater Management: We designed the site to efficiently manage stormwater runoff, leading to additional savings of over $600,000—all achieved before breaking ground.

Facility Features:

  • High-Quality Infrastructure: The facility includes full concrete drives and a state-of-the-art camera monitoring system for enhanced security.
  • Storage Options: With over 58,000 square feet of drive-up units available in multiple sizes, the facility offers a wide range of storage solutions.
  • Company Headquarters: A portion of the site is dedicated to the company’s headquarters and daily operations, ensuring a well-rounded development that meets both operational and customer needs.

This project not only maximizes functionality and efficiency but also demonstrates our commitment to smart engineering and sustainable practices.

Details:

Year: 2022

Total Sqft: 58,000+