APB Storage

MO

PROJECT DETAILS:

Year: 2022

Total Sqft: 58,000+

The project commenced with a thorough assessment of the rock subgrade conditions. By collaborating closely with engineers and soil consultants, we developed a comprehensive plan to tackle the challenges associated with the rocky terrain.

Key Achievements:

  • Cost-Effective Engineering: Our engineered solution minimized the difficult aspect of rock excavation, resulting in savings of over $400,000 in potential excavation costs.
  • Stormwater Management: We designed the site to efficiently manage stormwater runoff, leading to additional savings of over $600,000—all achieved before breaking ground.

Facility Features:

  • High-Quality Infrastructure: The facility includes full concrete drives and a state-of-the-art camera monitoring system for enhanced security.
  • Storage Options: With over 58,000 square feet of drive-up units available in multiple sizes, the facility offers a wide range of storage solutions.
  • Company Headquarters: A portion of the site is dedicated to the company’s headquarters and daily operations, ensuring a well-rounded development that meets both operational and customer needs.

This project not only maximizes functionality and efficiency but also demonstrates our commitment to smart engineering and sustainable practices.

Gallery

It’s your vision.
Build the best version.